ECV 314313 Guessing Paper & IMP Question Bank: Estimating, Costing and Valuation

In this article, we shared all the very important questions of ECV 314313 Estimating, Costing, and Valuation for the civil engineering backlog exam.

ECV 314313 Guessing Paper & IMP Question Bank

Students must solve the full question bank and the guessing paper provided below, and also refer to the notes for study.

ECV 314313 Guessing Paper MSBTE Winter 2025 Exam

Q 1: Attempt any FIVE of the following :
  1. State data is required for the preparation of a detailed estimate.
  2. Define: Task work and write factors affecting task work.
  3. State the different types of approximate estimates (also read all types in detail)
  4. List the four relevant software’s for preparing an estimate.
  5. Define the terms with their percentage:- i) Contingencies, ii) Work charged establishment
  6. Define: i) Scrap value ii) Salvage value
Q 2: Attempt any THREE of the following :
  1. Define rate analysis and state the factors affecting rate analysis.
  2. State the rules of deduction for plastering as per IS: 1200.
  3. State the percentage of steel for the following:- i) RCC footing ii) RCC Slab, iii) RCC Beam,iv) RCC Chajja.
Q 3: Attempt any THREE of the following :
  1. Explain the data required for the preparation of a detailed estimate.
  2. Draw the standard format of the measurement sheet and abstract sheet.
  3. Explain the PWD method for taking out quantities of items./ centre line method

IMP Question Bank: Estimating, Costing, and Valuation

Unit 1 (Basics of estimating and costing)

  1. Define Estimating and Costing.
  2. Write modes of measurement for the following: a) Brick work, b) Skirting, c)
    earthwork, d) R.C.C, e) Formwork, f) dado, g) woodwork for door and window
    frame.
  3. Define administrative approval, technical sanction, and budget provision.
  1. Describe rules for the deduction of plastering work as per IS 1200.
  2. Explain the standard format of different sheets.
  3. Enlist the checklist of items of work for load load-bearing structure and framed
    structure.
  4. Explain the role and responsibility of the estimator

Conclusion

In the above article, we shared all the important questions Estimating, Costing, and Valuation for the civil engineering backlog exam.

ECV 314313 New MSBTE Model Answer Papers

Suraj Diware
Suraj Diware

Hi everyone, I'm Suraj Diware, and I'm passionate about helping students succeed in MSBTE programs. This blog is dedicated to providing clear and concise explanations of MSBTE curriculum topics, along with practical tips and resources to support your learning journey.

Articles: 701

Leave a Reply

Your email address will not be published. Required fields are marked *