Electrical third-semester students solve the questions below in separate notebooks. You can easily find answers to all questions below in your GTD textbook.

GTD 313333 IMP Question For MSBTE Winter 2024 Exam

  • Chapter 1: Thermal Power Plant and Hydro Power Plant
  • 2 Marks Questions
  1. State any two advantages of the thermal power plant.
  2. List any two Thermal Power Station & Hydropower plants in Maharashtra with their installed capacity.
  3. Define Renewable and Non-Renewable energy resources. State one example each.
  4. State the function of coal and ash handling unit, Economiser & Superheater in thermal power plant.
  5. State the classification of hydro-power plants according to the quantity of water available.

PDF:

  • 4 Marks Questions
  1. State the factors governing selecting a site for a thermal power plant.
  2. Explain the layout of the working of a typical thermal power plant.
  3. Compare fire tube and water tube boilers used in thermal power plants.
  4. Draw a schematic arrangement of the hydroelectric power station. State the function of the surge tank, penstock, tailrace, Intake, trash rack, spillway, tunnel, Catchment area, and forebay.
  5. Describe the safe practices for Hydro Power Plants.
  6. Explain the Pumped Storage Power Plant with a neat diagram. State the advantages of a Pumped Storage Power Plant.
  • Chapter 2: Economics of Power Generation and Interconnected Power System
  • 2 Marks Questions
  1. Define Blackout & Brown out.
  2. Define national grid and state-connected grid.
  3. State any four advantages of interconnections of the grid system.
  4. Compare the base load plant with the peak load plant (Any four).
  • 4 Marks Questions
  1. Define the terms:
    • I) Connected load
    • (ii) Maximum demand
    • (iii) Demand Factor
    • (iv) Average Demand
    • (v) Load Factor
    • (vi) Diversity Factor
    • (vii) Plant capacity factor
    • (viii) Plant use Factor
    • (ix) Hot reserve
    • (x) Cold Reserve
    • (xi) Spinning Reserve
  2. Explain the choice of size and number of generator units in a power plant.
  3. Give the causes and impact and reasons of grid system fault.

Conclusion

We provided all the important questions of GTD Electrical power generation, transmission, and distribution above share and solve them with your friends.

GTD Micro Project Topics

Suraj Diware
Suraj Diware

Hi everyone, I'm Suraj Diware, and I'm passionate about helping students succeed in MSBTE programs. This blog is dedicated to providing clear and concise explanations of MSBTE curriculum topics, along with practical tips and resources to support your learning journey.

Articles: 640

One comment

Leave a Reply

Your email address will not be published. Required fields are marked *