EAC 22503 Manual All Practical Answer

Welcome to PracticalKida, in this post we provide EAC Estimating and Costing 22503 Manual All Practical Answer.

EAC Estimating and Costing 22503 Manual All Practical Answer

EAC 22503 subject is important for Civil 5th semester students, many students struggle to find solutions for practicals. so we collected all the answers in PDF and listed them below.

EAC 22503 Manual All Practical List Answer Pdf

  • Prepare a checklist of items to be executed with limits for the detailed time of the given structure from the given drawing.

Answer:

  • Prepare a report on market rates for given material, labor wages, hire charges of tools, and equipment required to construct the given structure as mentioned in serial number 1 above.
  • Prepare the detailed specification for given items using DSR
  • Prepare the approximate for the given civil engineering work (A)
  • Prepare the approximate for the given civil engineering work (B)
  • Prepare bill of quantities of given items from actual measurements
  • Prepare bill quantity of given items from actual measurements
  • Evaluate the number of items of work from the given set of drawings using a standard equipment sheet for the RCC structure using the description of items from DSR (1bhk).
  • Calculate reinforcement quantities from the given set of drawings for 100 m size 3 m × 4 m with bar bending schedule ( RCC column and footing)
  • Calculate the reinforcement quantities from the given set of drawings for a room size 3m × 4m with bar bending schedule CRCC lintel with chajja.
  • Prepare rate analysis for given five items
  • Prepare a detailed estimate of a bitumen road of one kilometer in length from the given drawing.
  • Prepare a detailed estimate of the well from a given set of drawing

Conclusion

In this post, we covered all practical answers for the Estimating and Costing 22503 Manual.

MSBTE Manual Answer

Leave a Reply

Your email address will not be published. Required fields are marked *