313321 ASU Manual Answer

Welcome to PracticalKida, in this blog post, we provide an answer to 313321 Advanced Surveying ASU Manual.

313321 ASU Manual Answer

Advanced surveying is an important subject for civil 3rd-semester students. so it is important to complete the manual of ASU as soon as possible.

313321 Advanced Surveying ASU Manual Answer

Sr.NoPractical NameAnswer
1Determine the Tacheometric ConstantClick Here
2Determine reduced levels of given stations and horizontal distances by Tacheometric Method
(Part I)
Click Here
3Determine reduced levels of given stations and horizontal distances by Tacheometric Method(Part II)Click Here
4Setting out of a circular curve by offsets from Long Chord Method.Click Here (Added Soon)
5Setting out a circular curve by Rankine’s Method of Deflection Angles. (Project) (Part I). Plot the curve details on A1 size imperial drawing sheet.Click Here (Added Soon)
6Setting out a circular curve by Rankine’s Method of Deflection Angles. (Project) (Part II). Plot the curve details on A1 size imperial drawing sheet.Click Here (Added Soon)
7Determine horizontal and vertical distance by using EDMClick Here (Added Soon)
8Determine Horizontal and vertical angles using Electronic Digital TheodoliteClick Here (Added Soon)
10Determine horizontal, vertical and slope distances using Total station equipment (Part I)Click Here (Added Soon)
11Determine horizontal, vertical and slope distances using Total station equipment. (Part II)Click Here (Added Soon)
12Determine horizontal and vertical angles using Total Station. (Part I).Click Here (Added Soon)
13Determine horizontal and vertical angles using Total Station.(Part II)Click Here (Added Soon)
14Determine the Reduced Levels of given stations (Minimum 10 station) (Part I)Click Here (Added Soon)
15Determine the Reduced Levels of given stations (Minimum 10 station) (Part II)Click Here (Added Soon)
21Prepare Building site layout by using Total Station (Project) (Part I). Plot the project details on A1 size imperial drawing sheet.Click Here (Added Soon)
22Prepare Building site layout by using Total Station (Project) (Part II). Plot the project details on A1 size imperial drawing sheet.Click Here (Added Soon)
23Carry out 5-Sided closed traverse Surveying project by using Total Station.(Project) Part I). Plot the traverse details on A1 size imperial drawing sheet.Click Here (Added Soon)
24Carry out 5-Sided closed traverse Surveying project by using Total Station. (Project) Part II). Plot the traverse details on A1 size imperial drawing sheet.Click Here (Added Soon)
25Locate the coordinates of a station with the help of GPS.Click Here (Added Soon)
30Write a brief report on the visit to nearby surveying software laboratory for visualization of image creation of contouring map of given area using given data OR Arrange Expert Lecture OR Show study videos of Photogrammetry surveying.Click Here (Added Soon)

Conclusion

In this blog post, we provided solutions for the 313321 manual all manual answers were added one by one please bookmark this post to get new practicals to answer quickly.

MSBTE K Scheme manual answer

Leave a Reply

Your email address will not be published. Required fields are marked *